![]() |
|||||||||||
|
|
|
|
|
|
|
||||||
![]() |
|
||||||||||
| |
|||||||||||
| Description | |||||||||||
| Roll On Loading of Tug onto Barge, Dry Docking and subsequent Launch of Tug | |||||||||||
Generator
lift with Four Tower Gantry System and loading on a high girder bridge
and dolly trailer |
|||||||||||
| Antonov Aircraft: Loading and Securing of Emergency Oilfield supplies | |||||||||||
| Antonov Aircraft: Loading and Securing of Mobile Power Plants | |||||||||||
| DC-8 Aircraft: Loading and Securing of Project cargo | |||||||||||
| Ro/Ro Ship: Loading | |||||||||||
| Discharge of Turbine from Barge to hydraulic transporter | |||||||||||
Discharge of over-dimensional pressure vessel from ship to hydraulic trailer onboard Barge followed by roll-off discharge from Barge to shore |
|||||||||||
| Chemical Tanker - Survey for Tank Cleanliness and Suitability | |||||||||||
Discharge
of Turbine from railcar by jack and slide, followed by loading on high
girder bridge transporter |
|||||||||||
Storage
Facility Suitability: both internal and external inspection of storage
facility |
|||||||||||
| Project cargo being loaded and secured on heavy lift vessel in Korea | |||||||||||
| Loading of specialized tubing/pipe in Bremerhaven/Antwerp | |||||||||||
| Loading Pressure Vessel in Korea | |||||||||||
| Copyright 2005 Eagle Maritime Consultants, Inc. All Rights Reserved. Site by Rista
Creative. |
|||||||||||